Overhaul of thermal plants
Cotonificio Albini Spa
Albini Energia overhauled the old diathermic oil evaporators of the Client and replace them with smoke tube boilers. All this has optimised thermal plant efficiency permitting the customer to save energy and money.
250
TOEs saved
220
EECs obtained
120.000€
Cost saving
2years
Payback time
Retrofitting of air conditioning plants
Cotonificio Albini Spa
Albini Energia has revised the air conditioning systems of the Client by inverterising the pump and the fans. The solution proposed has allowed to have savings in electric power consumption.
221
TOEs saved
589
EECs obtained
87.000€
Cost saving
3years
Payback time
Heat recovery from compressors
Niggeler & Kupfer Textile Spa
Albini Energia, thanks to the installation of an heat exchanger, has allowed Client to recover heat from the compressors and use it to heat the plant's water. The economic and energy benefits obtained have been important.
43
TOEs saved
144
EECs obtained
12.000€
Cost saving
3years
Payback time
Installation of heat exchangers for continuous lines
T.I.B.A. Srl
Albini Energia has installed an heat exchanger at the Customer's plant to recover heat energy from the hot wastewater. Thanks to the intervention, it has been possible to save €13,500/year.
47
TOEs saved
158
EECs obtained
13.500€
Cost saving
6years
Payback time
Installation of heat exchangers for batch lines
Tintogroup Srl
Albini Energia has installed an heat exchanger at the Customer's dye house, establishing to collect the machines wastewater in a tank. This made it possible to obtain an important economic benefit and a lowered payback time.
88
TOEs saved
296
EECs obtained
32.000€
Cost saving
8years
Payback time
Installation of water softener
Tintoria Emiliana Srl
Albini Energia has supplied and installed a water softening system for the Client’s dye house, supporting them in the choice of the best industrial solution.
Installation of osmosis system
Luce Tessilario Spa
Albini Energia has supplied and installed a reverse osmosis system for Client’s boiler, in support of an already existing softening plant. The solution proposed has allowed to have savings in natural gas power consumption and to recoup the investment over a short time.