Albini Energia helped the customer to choose a reverse osmosis system used to integrate treatment of the industrial boiler feed water which, prior to the intervention, only underwent a softening process.
The installed system, which is easily installed in the company thermal plant, processes 1,500 litres/hour of water and is installed on the stainless steel skid.
The Albini Energia solution, which subjects the water to further treatment, significantly reduces condensation wastewater with a saving of 16,445 standard cubic metres of methane per year (3 TOEs) which amounts to €5,500/year. The payback time is 2.5 years.